Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
5.5%
OF COST SPENT
₹92,118 spent
of ₹16.61 L sanctioned
₹15.69 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹16.61 L
Pure scheme (wage + material)
Expenditure since inception
₹92,118
5.5% of sanction
Balance cost (unspent)
₹15.69 L
Wage₹9.91 L
Material₹5.77 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh