Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.7%
OF COST SPENT
₹46,717 spent
of ₹71.18 L sanctioned
₹70.71 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹71.18 L
Pure scheme (wage + material)
Expenditure since inception
₹46,717
0.7% of sanction
Balance cost (unspent)
₹70.71 L
Wage₹28.83 L
Material₹41.88 L