Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
19.6%
OF COST SPENT
₹14.56 L spent
of ₹74.24 L sanctioned
₹59.68 L still to spend
on 15 ongoing works
Works ongoing
15
Open the list of these works →
Sanctioned
₹74.24 L
Pure scheme (wage + material)
Expenditure since inception
₹14.56 L
19.6% of sanction
Balance cost (unspent)
₹59.68 L
Wage₹46.52 L
Material₹13.16 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh