Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
41.9%
OF COST SPENT
₹2.17 Cr spent
of ₹5.19 Cr sanctioned
₹3.02 Cr still to spend
on 179 ongoing works
Works ongoing
179
Open the list of these works →
Sanctioned
₹5.19 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.17 Cr
41.9% of sanction
Balance cost (unspent)
₹3.02 Cr
Wage₹95.11 L
Material₹2.06 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost