Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
38.9%
OF COST SPENT
₹1.34 Cr spent
of ₹3.44 Cr sanctioned
₹2.10 Cr still to spend
on 110 ongoing works
Works ongoing
110
Open the list of these works →
Sanctioned
₹3.44 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.34 Cr
38.9% of sanction
Balance cost (unspent)
₹2.10 Cr
Wage₹64.96 L
Material₹1.45 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore