Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
45.9%
OF COST SPENT
₹37.79 L spent
of ₹82.31 L sanctioned
₹44.52 L still to spend
on 63 ongoing works
Works ongoing
63
Open the list of these works →
Sanctioned
₹82.31 L
Pure scheme (wage + material)
Expenditure since inception
₹37.79 L
45.9% of sanction
Balance cost (unspent)
₹44.52 L
Wage₹28.48 L
Material₹16.04 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Lakh