Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
21.5%
OF COST SPENT
₹4.12 L spent
of ₹19.21 L sanctioned
₹15.09 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹19.21 L
Pure scheme (wage + material)
Expenditure since inception
₹4.12 L
21.5% of sanction
Balance cost (unspent)
₹15.09 L
Wage₹10.47 L
Material₹4.61 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh