Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
20.8%
OF COST SPENT
₹5.55 L spent
of ₹26.70 L sanctioned
₹21.15 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹26.70 L
Pure scheme (wage + material)
Expenditure since inception
₹5.55 L
20.8% of sanction
Balance cost (unspent)
₹21.15 L
Wage₹12.28 L
Material₹8.87 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh