Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
62%
OF COST SPENT
₹1.10 Cr spent
of ₹1.77 Cr sanctioned
₹67.32 L still to spend
on 142 ongoing works
Works ongoing
142
Open the list of these works →
Sanctioned
₹1.77 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.10 Cr
62% of sanction
Balance cost (unspent)
₹67.32 L
Wage₹53.65 L
Material₹13.67 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type