Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
45.6%
OF COST SPENT
₹7.91 Cr spent
of ₹17.34 Cr sanctioned
₹9.42 Cr still to spend
on 163 ongoing works
Works ongoing
163
Open the list of these works →
Sanctioned
₹17.34 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.91 Cr
45.6% of sanction
Balance cost (unspent)
₹9.42 Cr
Wage₹6.15 Cr
Material₹3.27 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block