Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
50.7%
OF COST SPENT
₹44.76 Cr spent
of ₹88.31 Cr sanctioned
₹43.55 Cr still to spend
on 5,629 ongoing works
Works ongoing
5,629
Open the list of these works →
Sanctioned
₹88.31 Cr
Pure scheme (wage + material)
Expenditure since inception
₹44.76 Cr
50.7% of sanction
Balance cost (unspent)
₹43.55 Cr
Wage₹23.42 Cr
Material₹20.14 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type