Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
2%
OF COST SPENT
₹1.38 Cr spent
of ₹69.68 Cr sanctioned
₹68.29 Cr still to spend
on 272 ongoing works
Works ongoing
272
Open the list of these works →
Sanctioned
₹69.68 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.38 Cr
2% of sanction
Balance cost (unspent)
₹68.29 Cr
Wage₹40.27 Cr
Material₹28.02 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore