Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
2.2%
OF COST SPENT
₹12.60 L spent
of ₹5.79 Cr sanctioned
₹5.67 Cr still to spend
on 92 ongoing works
Works ongoing
92
Open the list of these works →
Sanctioned
₹5.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹12.60 L
2.2% of sanction
Balance cost (unspent)
₹5.67 Cr
Wage₹2.82 Cr
Material₹2.85 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Indore — Mhow −₹30.65 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore