Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Trench
24.4%
OF COST SPENT
₹93.66 L spent
of ₹3.84 Cr sanctioned
₹2.90 Cr still to spend
on 82 ongoing works
Works ongoing
82
Open the list of these works →
Sanctioned
₹3.84 Cr
Pure scheme (wage + material)
Expenditure since inception
₹93.66 L
24.4% of sanction
Balance cost (unspent)
₹2.90 Cr
Wage₹2.32 Cr
Material₹58.25 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr