Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
90.6%
OF COST SPENT
₹46.87 L spent
of ₹51.76 L sanctioned
₹4.88 L still to spend
on 3 ongoing works
Works ongoing
3
Open the list of these works →
Sanctioned
₹51.76 L
Pure scheme (wage + material)
Expenditure since inception
₹46.87 L
90.6% of sanction
Balance cost (unspent)
₹4.88 L
Wage₹3.87 L
Material₹1.01 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh