Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
85.7%
OF COST SPENT
₹67.05 L spent
of ₹78.27 L sanctioned
₹11.22 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹78.27 L
Pure scheme (wage + material)
Expenditure since inception
₹67.05 L
85.7% of sanction
Balance cost (unspent)
₹11.22 L
Wage₹7.37 L
Material₹3.85 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh