Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
50.4%
OF COST SPENT
₹1.23 Cr spent
of ₹2.45 Cr sanctioned
₹1.21 Cr still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹2.45 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.23 Cr
50.4% of sanction
Balance cost (unspent)
₹1.21 Cr
Wage₹76.35 L
Material₹45.09 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost