Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
1.5%
OF COST SPENT
₹20.40 L spent
of ₹13.69 Cr sanctioned
₹13.48 Cr still to spend
on 81 ongoing works
Works ongoing
81
Open the list of these works →
Sanctioned
₹13.69 Cr
Pure scheme (wage + material)
Expenditure since inception
₹20.40 L
1.5% of sanction
Balance cost (unspent)
₹13.48 Cr
Wage₹7.03 Cr
Material₹6.45 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore