Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
63.8%
OF COST SPENT
₹1.77 Cr spent
of ₹2.78 Cr sanctioned
₹1.01 Cr still to spend
on 17 ongoing works
Works ongoing
17
Open the list of these works →
Sanctioned
₹2.78 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.77 Cr
63.8% of sanction
Balance cost (unspent)
₹1.01 Cr
Wage₹46.75 L
Material₹54.01 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr