Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
72.3%
OF COST SPENT
₹1.16 Cr spent
of ₹1.61 Cr sanctioned
₹44.43 L still to spend
on 19 ongoing works
Works ongoing
19
Open the list of these works →
Sanctioned
₹1.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.16 Cr
72.3% of sanction
Balance cost (unspent)
₹44.43 L
Wage₹25.09 L
Material₹19.35 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore