Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWorks for Flood Control and Protection
7.3%
OF COST SPENT
₹2.88 L spent
of ₹39.31 L sanctioned
₹36.43 L still to spend
on 12 ongoing works
Works ongoing
12
Open the list of these works →
Sanctioned
₹39.31 L
Pure scheme (wage + material)
Expenditure since inception
₹2.88 L
7.3% of sanction
Balance cost (unspent)
₹36.43 L
Wage₹27.61 L
Material₹8.83 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost