Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMG
12.4%
OF COST SPENT
₹2.57 L spent
of ₹20.69 L sanctioned
₹18.13 L still to spend
on 11 ongoing works
Works ongoing
11
Open the list of these works →
Sanctioned
₹20.69 L
Pure scheme (wage + material)
Expenditure since inception
₹2.57 L
12.4% of sanction
Balance cost (unspent)
₹18.13 L
Wage₹7.84 L
Material₹10.29 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh