Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Check Dam/Stop Dam
32.4%
OF COST SPENT
₹77.06 L spent
of ₹2.38 Cr sanctioned
₹1.61 Cr still to spend
on 47 ongoing works
Works ongoing
47
Open the list of these works →
Sanctioned
₹2.38 Cr
Pure scheme (wage + material)
Expenditure since inception
₹77.06 L
32.4% of sanction
Balance cost (unspent)
₹1.61 Cr
Wage₹68.30 L
Material₹92.41 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh