Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
33.3%
OF COST SPENT
₹1.87 Cr spent
of ₹5.63 Cr sanctioned
₹3.76 Cr still to spend
on 188 ongoing works
Works ongoing
188
Open the list of these works →
Sanctioned
₹5.63 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.87 Cr
33.3% of sanction
Balance cost (unspent)
₹3.76 Cr
Wage₹2.67 Cr
Material₹1.09 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore