Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
54.5%
OF COST SPENT
₹4.80 Cr spent
of ₹8.82 Cr sanctioned
₹4.01 Cr still to spend
on 154 ongoing works
Works ongoing
154
Open the list of these works →
Sanctioned
₹8.82 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.80 Cr
54.5% of sanction
Balance cost (unspent)
₹4.01 Cr
Wage₹2.58 Cr
Material₹1.43 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore