Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
63.8%
OF COST SPENT
₹77.94 L spent
of ₹1.22 Cr sanctioned
₹44.31 L still to spend
on 8 ongoing works
Works ongoing
8
Open the list of these works →
Sanctioned
₹1.22 Cr
Pure scheme (wage + material)
Expenditure since inception
₹77.94 L
63.8% of sanction
Balance cost (unspent)
₹44.31 L
Wage₹11.33 L
Material₹32.98 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh