Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Bund
1.9%
OF COST SPENT
₹12.24 L spent
of ₹6.30 Cr sanctioned
₹6.18 Cr still to spend
on 144 ongoing works
Works ongoing
144
Open the list of these works →
Sanctioned
₹6.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹12.24 L
1.9% of sanction
Balance cost (unspent)
₹6.18 Cr
Wage₹4.14 Cr
Material₹2.05 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore