Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Water Drain/Diversion Channel/Drainage/Field Channel
32.7%
OF COST SPENT
₹10.65 Cr spent
of ₹32.56 Cr sanctioned
₹21.91 Cr still to spend
on 588 ongoing works
Works ongoing
588
Open the list of these works →
Sanctioned
₹32.56 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.65 Cr
32.7% of sanction
Balance cost (unspent)
₹21.91 Cr
Wage₹12.34 Cr
Material₹9.56 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr