Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
25.5%
OF COST SPENT
₹70.47 L spent
of ₹2.76 Cr sanctioned
₹2.06 Cr still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹2.76 Cr
Pure scheme (wage + material)
Expenditure since inception
₹70.47 L
25.5% of sanction
Balance cost (unspent)
₹2.06 Cr
Wage₹1.19 Cr
Material₹86.38 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore