Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
34.9%
OF COST SPENT
₹2.45 Cr spent
of ₹7.02 Cr sanctioned
₹4.57 Cr still to spend
on 68 ongoing works
Works ongoing
68
Open the list of these works →
Sanctioned
₹7.02 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.45 Cr
34.9% of sanction
Balance cost (unspent)
₹4.57 Cr
Wage₹2.82 Cr
Material₹1.75 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore