Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
32.2%
OF COST SPENT
₹68.87 L spent
of ₹2.14 Cr sanctioned
₹1.45 Cr still to spend
on 42 ongoing works
Works ongoing
42
Open the list of these works →
Sanctioned
₹2.14 Cr
Pure scheme (wage + material)
Expenditure since inception
₹68.87 L
32.2% of sanction
Balance cost (unspent)
₹1.45 Cr
Wage₹1.06 Cr
Material₹38.88 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹8.26 Cr