Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Cement Concrete Roads
61.5%
OF COST SPENT
₹2.25 Cr spent
of ₹3.66 Cr sanctioned
₹1.41 Cr still to spend
on 386 ongoing works
Works ongoing
386
Open the list of these works →
Sanctioned
₹3.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.25 Cr
61.5% of sanction
Balance cost (unspent)
₹1.41 Cr
Wage₹1.12 Cr
Material₹29.05 L
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore