Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA
44%
OF COST SPENT
₹121.85 Cr spent
of ₹276.96 Cr sanctioned
₹155.11 Cr still to spend
on 17,343 ongoing works
Works ongoing
17,343
Open the list of these works →
Sanctioned
₹276.96 Cr
Pure scheme (wage + material)
Expenditure since inception
₹121.85 Cr
44% of sanction
Balance cost (unspent)
₹155.11 Cr
Wage₹85.23 Cr
Material₹69.88 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore