Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGFarm Pond
36.2%
OF COST SPENT
₹3.49 Cr spent
of ₹9.65 Cr sanctioned
₹6.16 Cr still to spend
on 379 ongoing works
Works ongoing
379
Open the list of these works →
Sanctioned
₹9.65 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.49 Cr
36.2% of sanction
Balance cost (unspent)
₹6.16 Cr
Wage₹4.58 Cr
Material₹1.58 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore