Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.2%
OF COST SPENT
₹1.60 L spent
of ₹7.49 Cr sanctioned
₹7.47 Cr still to spend
on 128 ongoing works
Works ongoing
128
Open the list of these works →
Sanctioned
₹7.49 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.60 L
0.2% of sanction
Balance cost (unspent)
₹7.47 Cr
Wage₹3.01 Cr
Material₹4.46 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Ashok Nagar — Chanderi ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore