Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
79.9%
OF COST SPENT
₹1.14 Cr spent
of ₹1.43 Cr sanctioned
₹28.70 L still to spend
on 4 ongoing works
Works ongoing
4
Open the list of these works →
Sanctioned
₹1.43 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.14 Cr
79.9% of sanction
Balance cost (unspent)
₹28.70 L
Wage₹28.46 L
Material₹24,140
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore