Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
2.8%
OF COST SPENT
₹35,400 spent
of ₹12.72 L sanctioned
₹12.36 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹12.72 L
Pure scheme (wage + material)
Expenditure since inception
₹35,400
2.8% of sanction
Balance cost (unspent)
₹12.36 L
Wage₹3.53 L
Material₹8.84 L