Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
22.3%
OF COST SPENT
₹90.65 L spent
of ₹4.06 Cr sanctioned
₹3.16 Cr still to spend
on 133 ongoing works
Works ongoing
133
Open the list of these works →
Sanctioned
₹4.06 Cr
Pure scheme (wage + material)
Expenditure since inception
₹90.65 L
22.3% of sanction
Balance cost (unspent)
₹3.16 Cr
Wage₹2.03 Cr
Material₹1.13 Cr
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore