Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Cement Concrete Roads
44%
OF COST SPENT
₹91.62 L spent
of ₹2.08 Cr sanctioned
₹1.17 Cr still to spend
on 248 ongoing works
Works ongoing
248
Open the list of these works →
Sanctioned
₹2.08 Cr
Pure scheme (wage + material)
Expenditure since inception
₹91.62 L
44% of sanction
Balance cost (unspent)
₹1.17 Cr
Wage₹1.01 Cr
Material₹15.58 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Burhanpur — Khaknar ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh