Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstr of Gabion
25.5%
OF COST SPENT
₹5.58 L spent
of ₹21.94 L sanctioned
₹16.35 L still to spend
on 6 ongoing works
Works ongoing
6
Open the list of these works →
Sanctioned
₹21.94 L
Pure scheme (wage + material)
Expenditure since inception
₹5.58 L
25.5% of sanction
Balance cost (unspent)
₹16.35 L
Wage₹8.87 L
Material₹7.48 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh