Data as of 29 Oct 2026, 07:04 Admin login
FY
Reset

Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
42.4%
OF COST SPENT
₹1.99 Cr spent
of ₹4.68 Cr sanctioned
₹2.69 Cr still to spend
on 49 ongoing works
Works ongoing
49
Open the list of these works →
Sanctioned
₹4.68 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.99 Cr
42.4% of sanction
Balance cost (unspent)
₹2.69 Cr
Wage₹94.56 L
Material₹1.75 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore