Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
15.8%
OF COST SPENT
₹73.90 L spent
of ₹4.66 Cr sanctioned
₹3.92 Cr still to spend
on 83 ongoing works
Works ongoing
83
Open the list of these works →
Sanctioned
₹4.66 Cr
Pure scheme (wage + material)
Expenditure since inception
₹73.90 L
15.8% of sanction
Balance cost (unspent)
₹3.92 Cr
Wage₹2.56 Cr
Material₹1.36 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore