Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
36.4%
OF COST SPENT
₹21.14 L spent
of ₹58.04 L sanctioned
₹36.89 L still to spend
on 31 ongoing works
Works ongoing
31
Open the list of these works →
Sanctioned
₹58.04 L
Pure scheme (wage + material)
Expenditure since inception
₹21.14 L
36.4% of sanction
Balance cost (unspent)
₹36.89 L
Wage₹25.34 L
Material₹11.56 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type