Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Trench
1.8%
OF COST SPENT
₹1.13 L spent
of ₹63.18 L sanctioned
₹62.06 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹63.18 L
Pure scheme (wage + material)
Expenditure since inception
₹1.13 L
1.8% of sanction
Balance cost (unspent)
₹62.06 L
Wage₹49.68 L
Material₹12.38 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Bhind — Bhind ₹39,528
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh