Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
48.7%
OF COST SPENT
₹148.90 Cr spent
of ₹305.86 Cr sanctioned
₹156.96 Cr still to spend
on 11,812 ongoing works
Works ongoing
11,812
Open the list of these works →
Sanctioned
₹305.86 Cr
Pure scheme (wage + material)
Expenditure since inception
₹148.90 Cr
48.7% of sanction
Balance cost (unspent)
₹156.96 Cr
Wage₹83.57 Cr
Material₹73.39 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore