Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of Aganwadi
1.3%
OF COST SPENT
₹2.23 L spent
of ₹1.70 Cr sanctioned
₹1.68 Cr still to spend
on 37 ongoing works
Works ongoing
37
Open the list of these works →
Sanctioned
₹1.70 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.23 L
1.3% of sanction
Balance cost (unspent)
₹1.68 Cr
Wage₹42.23 L
Material₹1.26 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh