Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
51.6%
OF COST SPENT
₹41.39 L spent
of ₹80.21 L sanctioned
₹38.82 L still to spend
on 131 ongoing works
Works ongoing
131
Open the list of these works →
Sanctioned
₹80.21 L
Pure scheme (wage + material)
Expenditure since inception
₹41.39 L
51.6% of sanction
Balance cost (unspent)
₹38.82 L
Wage₹20.23 L
Material₹18.60 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh