Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
45.5%
OF COST SPENT
₹70.10 L spent
of ₹1.54 Cr sanctioned
₹83.99 L still to spend
on 14 ongoing works
Works ongoing
14
Open the list of these works →
Sanctioned
₹1.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹70.10 L
45.5% of sanction
Balance cost (unspent)
₹83.99 L
Wage₹24.02 L
Material₹59.97 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh