Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
0.6%
OF COST SPENT
₹2.52 L spent
of ₹4.26 Cr sanctioned
₹4.23 Cr still to spend
on 30 ongoing works
Works ongoing
30
Open the list of these works →
Sanctioned
₹4.26 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.52 L
0.6% of sanction
Balance cost (unspent)
₹4.23 Cr
Wage₹1.74 Cr
Material₹2.49 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore