Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Bund
29.4%
OF COST SPENT
₹2.13 Cr spent
of ₹7.25 Cr sanctioned
₹5.12 Cr still to spend
on 230 ongoing works
Works ongoing
230
Open the list of these works →
Sanctioned
₹7.25 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.13 Cr
29.4% of sanction
Balance cost (unspent)
₹5.12 Cr
Wage₹3.51 Cr
Material₹1.61 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block